Feb 16, 2026
Project update
6 of 11
Production Progress Report #1
by
Billy Wang
Hey everyone!
Here’s a quick production update to keep things clear and grounded.
HDMI/VGA Finalized, DP in Final Fit Optimization
KVM-GO is in a healthy and steady state right now. HDMI and VGA versions are fully locked and the DP version is in its final mechanical-fit optimization, so that all variants can share the same enclosure and production flow.
1. Circuit Board Status (DP)
- HDMI + VGA: finalized
- DP: final mechanical optimization (shortening board length to match HDMI/VGA)
This step is purely mechanical/packaging related, not a change in product direction or feature set. The goal is to enable:
- One unified metal enclosure
- Simpler assembly
- More consistent, cost-controlled production.
2. Accessories Progress
- Type-C to Type-A black USB cables: ordered
- Screws: ordered
- Stickers: ordered
- Openterface Toolkit boxes: ordered
- User manual: design in progress
- Product boxes: design in progress
Accessory preparation is moving smoothly and in parallel with hardware validation.
- HDMI + VGA metal shells: ready
- DP metal shell: pending final DP board length
- Orange USB 3.0 Type-C cables: ready
4. Certification & Compliance
We’re preparing materials and test planning for:
- CE
- RoHS
- FCC
- OSHWA submission
Certification testing is now in the preparation stage. We’ll share concrete milestones once lab schedules and results are available.
5. Thermal Solution (Validation in Progress)
Because we’re packing high performance into a compact enclosure, thermal validation is being done carefully, not rushed.
- CNC metal heatsink samples are under test
- Multiple suppliers are being evaluated to compare machining quality and consistency
6. Firmware & Software Readiness
Hardware progress continues alongside software validation to keep the out-of-box experience smooth.
- Host app builds are stable; ongoing bug fixes and UX polish continue
- Compatibility testing across macOS/Windows/Linux is ongoing
- iPadOS support: development is being accelerated for an iPad-compatible app
7. Electronic Components & PCBA
- Electronic components are being purchased and staged
- Mass PCBA will start after compliance tests confirms the final configuration
This is a normal production workflow and helps avoid rework while keeping manufacturing efficient.
8. Plastic Parts
- Orange cover: 3D printing profile tuning in progress
- Nylon black cover: ordered
What’s Next
In the next update, we’ll share:
- DP final board length confirmation and enclosure fit check
- Certification progress and lab scheduling updates
- Final thermal solution decision (heatsink + interface material)
Thanks again for backing a small team building practical, open hardware.
We’ll keep updates frequent, honest, and grounded in real progress.
Openterface Team | TechxArtisan